City Engineer's Office - Profile
- Details
- Friday, 03 July 2015 - 12:54:01 PM
I. MANDATE
Prepares plan designs, program costs, estimated and specification of all infrastructure projects. Take charge of the construction, repair, improvement and rehabilitation of all city infrastructure projects. Implement maintenance activities, such as repairs of road/building/canal/streetlights, spring development, waterworks system within the city government. Implement National Building Code and other referral codes. Inspection of Mechanical and Electrical installation of all public buildings, industrial, commercial and institutional building. Maintains personnel administrative functions. Maintains light and heavy equipment.
II. VISION
The City Engineer’s Office, with its high technology expertise, thru the use of its state of the art instruments, gadgets and equipments and in partnership with city government envisions a highly sustainable and competitive city in terms of infrastructure development and sports made possible through its accessible farm to market roads, enough water supply and electricity even in the most remote barangays and a sports arena engineered to perfection.
III. MISSION
The City Engineer’s Office exists to provide Professional Engineering services that are appropriate, innovative and economical in order to transform Batangas City into a more progressive metropolis in terms of infrastructures and sustainable development.
Our mission is to provide cost effective solutions that will meet the present and future requirements of the City. To accomplish this, we shall study all reasonable options through new technologies in order to offer excellence in the design and delivery of engineering services.
IV. Service Pledge:
We, at the City Engineer’s Office, do hereby pledge to:
1. Serve the citizen of Batangas City with utmost honesty, integrity and transparency;
2. Streamline our system to make our services easier and less time - consuming;
3. Treat our clientele with due respect and sincerity
PROFILE
With the conversion of Batangas Municipality into a city on July 23, 1969, the Office of the City Engineer was simultaneously organized as one of the departments of Batangas City Government. This department first held its office in a small room at the back of the City Hall. Then it transferred and rented a residential house at P. Panganiban Street for some months, before it was finally housed in its own building along P. Herrera St. corner of Calumpang Ferry Road at Kumintang Ibaba sometime in 1971.
In the beginning, the office was composed of 60 personnel headed by the Chief of Office, the City Engineer, with one Assistant City Engineer. As years passed by, the number of personnel increased gradually due to increasing demands and programs for various services and projects needed for the 105 barangays of Batangas City. From the original number 60 rose to now 167 with addition of a number of job order employees. The Assistant City Engineer now became 2, one for the office administration and the other, for operation. The office is operating with its budget under the local fund approved by the Sangguniang Panlungsod. They are allocated for the different programs and activities to be carried out by the office. These programs and activities are worked jointly by the office 8 divisions under target schedules of accomplishments. These divisions are Administrative Division, Planning and Programming Division, Architectural and Construction Division, Building Permit Division, Mechanical-Electrical Safety Division, Maintenance Division, Equipment Pool Division, and Waterworks Division,
Among the programs of concern of the office basically are the following:
1. Construction, repair and maintenance of roads, bridges, schools and other public buildings, waterworks facilities and other structures.
2. Implementation of the local building code program and assess the permit fee for the construction of residential, private buildings and other structures.
3. Inspection of machineries in all commercial, industrial and institutional establishments.
4. Prepares plan, specifications, program of works for projects, estimates of roads, bridges, buildings and other structures.
City Engineer's Office Citizen's Charter
- Details
- Friday, 03 July 2015 - 12:54:01 PM
DEPARTMENT: CITY ENGINEERING OFFICE ABOUT THE SERVICE: Requirements:
In Case the applicant is the owner of the lot, please include In Case the applicant is not the registered owner of the lot, please include: Schedule of Availability: 8:00 am to 5:00 pm Monday to Friday
|
|||||||||||||||||||||||||||||||||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
||||||||||||||||||||||||||||||
1 |
a. Secure Certificate of Zoning Compliance (CZC)
|
|
City Planning & Development |
City Hall – P. Burgos St.
|
|
||||||||||||||||||||||||||||||
b. Secures City Environmental Certificate (CEC)/Issuance order of payment (OP) | City Environment and Natural Resources Office (ENRO) | City Hall – P. Burgos St. | |||||||||||||||||||||||||||||||||
c. Secure Veterinary Certificate in case the building is for Agricultural |
Office of the City Veterinary and Agricultural Services (OCVAS) |
Bolbok |
|||||||||||||||||||||||||||||||||
d. Secures Fire Safety Evaluation Clearance (FSEC) and payment of the Fire Code Construction Tax
|
Bureau of Fire Protection (BFP) |
Bureau of Fire Protection building – Rizal Ave. Ext. |
|||||||||||||||||||||||||||||||||
2 |
a. Submits duly accomplished application forms with complete set of requirements, Certificate of Zoning Compliance (CZC), City Environmental Certificate (CEC) and Fire Safety Evaluation Clearance (FSEC) to CEO table. Come Back after 2 days.
|
a. Receives duly accomplished application forms, plans and complete set of requirements | City Engineering Office table |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St. |
3 days |
||||||||||||||||||||||||||||||
b. Advises the applicant to return after 2 days to claim the Order of Payment (OP)
|
City Engineering Office table |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St. |
|||||||||||||||||||||||||||||||||
c. Evaluates plans as to Structural, Architectural, Electrical, Mechanical, Sanitary with corresponding assessment
|
Technical Staff of Processing and Evaluation Section Building Permit Division | City Engineering Office – P. Herrera St. | |||||||||||||||||||||||||||||||||
d. Monitors/ Inspects at site whether the project was started or not
|
Inspection and Enforcement Section |
City Engineering Office – P. Herrera St. |
|||||||||||||||||||||||||||||||||
e. Prepares Order of Payment
|
Technical Staff of Processing and Evaluation Section |
City Engineering Office – P. Herrera St. | |||||||||||||||||||||||||||||||||
f. Process The Building Permit and approved |
|||||||||||||||||||||||||||||||||||
3 |
b. Claims Order of Payment (OP) |
Issues Order of Payment |
City Engineering Office table |
|
|||||||||||||||||||||||||||||||
4 |
Proceed to Business |
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
||||||||||||||||||||||||||||||||
5 |
Pays the appropriate |
|
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
|||||||||||||||||||||||||||||||
6 |
|
|
|
||||||||||||||||||||||||||||||||
7 |
|
|
City Engineering Office table |
|
DEPARTMENT: CITY ENGINEERING OFFICE
Schedule of Availability: 8:00 am to 5:00 pm Monday to Friday How to avail of the service: |
|||||||||||||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
||||||||||
1 |
a. Secure Zoning Permit for Occupancy (ZPO)
|
|
City Planning and |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St. |
|
||||||||||
b. Secure Fire Safety Inspection Certificate (FSIC) |
Bureau of Fire Protection |
Bureau of Fire Protection building – Rizal Ave. Ext. |
|||||||||||||
2 |
a. Secure Certificate of Occupancy
b.Submits accomplished Certificate of completion forms and complete sets of requirements
|
a.Receives the submitted documents and check
b. Prepares Certificate of Occupancy and endorsement to Zoning Division & Fire Department |
City Engineering Office table
|
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St. City Engineering Office – P. Herrera St. |
|
||||||||||
c. Returns the certificate of occupancy to receiving section and submits the documents for final approval |
c. Conducts inspection
d. Asses and prepare Order of Payment
e. Process the Occupancy Permit and approved. |
Inspection and Enforcement Section
Technical Staff of Processing and Evaluation Section Building Permit Division |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St.
City Engineering Office – P. Herrera St. |
||||||||||||
3 |
b. Claims the Order of Payment (OP) |
Issues Order of Payment |
City Engineering Office table |
|
|||||||||||
4 |
Proceed to Business |
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
||||||||||||
5 |
Pays the appropriate |
|
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
|||||||||||
6 |
|
|
|
||||||||||||
7 |
|
|
City Engineering Office table |
|
DEPARTMENT: CITY ENGINEERING OFFICE ABOUT THE SERVICE: Requirements:
Schedule of Availability: 8:00 am to 5:00 pm Monday to Friday How to avail of the service: |
|||||||||||||||||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
||||||||||||||
1 |
a. Secure Certificate of Zoning Compliance for business
|
|
City Planning & Development |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St.
|
|
||||||||||||||
b. Secures City Environmental Certificate | City Environment and Natural Resources Office (CENRO) |
Gusaling Pangkapayapaan at |
|||||||||||||||||
2 |
a. Submits duly accomplished completion form together with other requirements including pre-requisite requirements |
a. Receives the accomplished completion forms and other requirements | City Engineering Office table |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St. |
2 days |
||||||||||||||
b. Conducts inspection and prepares inspection report
|
Inspection and Enforcement Section |
City Engineering Office – P. Herrera St. |
|||||||||||||||||
c. Asses the Certificate of Occupancy Permit fees. Process the documents and approves
|
Technical Staff of Processing and Evaluation Section Building Permit Division | City Engineering Office – P. Herrera St. | |||||||||||||||||
3 |
b. Claims the Order of Payment (OP) |
Issues Order of Payment |
City Engineering Office table |
|
|||||||||||||||
4 |
Proceed to Business |
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
||||||||||||||||
5 |
Pays the appropriate |
|
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
|||||||||||||||
6 |
|
|
|
||||||||||||||||
7 |
|
|
City Engineering Office table |
|
DEPARTMENT: CITY ENGINEERING OFFICE |
|||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
1 |
Submits accomplished application form and all required documents
|
Evaluates all documents and application form.Informs applicant that inspection will be conducted on the premises and schedules inspection.
|
City Engineering Office table |
Building and Occupancy Permit One-Stop- Shop (BPOSS) – City Hall Compound – P. Burgos St.
|
1 day |
2 |
Allows the technical |
a. Conducts Inspection. Prepare inspection report with recommendation and approval of the Division chief |
Inspection and Enforcement Section |
City Engineer’s Office – P. Herrera St. |
2 days |
b. Assess Electrical Permit Fees and prepares Order of Payment
|
Technical Staff of Processing and Evaluation Section Building Permit Division |
City Engineer’s Office – P. Herrera St. |
|||
|
|
City Engineer’s Office – P. Herrera St. |
|||
3 |
b. Claims the Order of Payment (OP) |
Issues Order of Payment |
City Engineering Office table |
|
|
4 |
Proceed to Business |
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
||
5 |
Pays the appropriate |
|
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
|
6 |
|
|
|
||
7 |
|
|
City Engineering Office table |
|
DEPARTMENT: CITY ENGINEERING OFFICE How to avail of the service: |
|||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
1 |
a. Submits accomplished application form for demolition
|
Evaluates and assess the application if all are in order |
City Planning & Development |
Building and Occupancy Permit One-Stop-Shop (BPOSS) – City Hall Compound – P. Burgos St.
|
|
2 | b. Allows the Inspector to inspect the building to be demolish |
a. Conducts inspection and make inspection report
|
City Engineer’s Office – P. Herrera St. |
||
|
b. Asses the Demolition Permit fee | City Engineer’s Office – P. Herrera St. | |||
3 |
b. Claims the Order of Payment (OP) |
Issues Order of Payment |
City Engineering Office table |
|
|
4 |
Proceed to Business |
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
||
5 |
Pays the appropriate |
|
City Treasurer’s Office |
Business One-Stop-Shop (BOSS) City Hall Compound |
|
6 |
|
|
|
||
7 |
|
|
City Engineering Office table |
|
DEPARTMENT: CITY ENGINEERING OFFICE Schedule of Availability: 8:00 am to 5:00 pm Monday to Friday How to avail of the service: |
|||||
STEP NO. | CLIENT STEP |
AGENCY / LGU Action | Office /Officer Responsible | Location of Office | Maximum Duration of Step (time) |
1 |
Submit all documents and Official Receipt from TDRO
|
a. Accepts and checks the submitted documents and official receipt (OR) |
|
|
|
b. Advises the client for inspection of their unit | 5 mins. | ||||
|
|
|
Motor pool Shop |
|
25 mins. |
3 |
Waits for the certificate |
Prepares Certificate of Road Worthiness |
Motor pool Office |
|
15 mins. |
4 |
Receives the certificate |
Issues the certificate and advises the applicant to proceed to TDRO |
|
City Engineering Office – P. Herrera St. |
15 mins. |